Greencore
JLF were recently involved in a project encompassing site wide civil engineering works at the Greencore factory site in Warrington. Works were required to enable Greencore to proceed with a new water treatment facility which will assist with the production of their food products.
The project comprised of the following items:
- Demolition and removal of existing infrastructure including steelwork pipe gantries, masonry buildings, and acoustic cladding panelling.
- Construction of new reinforced concrete slabs to support 40 tonne storage tanks.
- Installation of new surface water drainage.
- Construction of new blockwork to support pipework.
- Below ground drainage connections.
- Installation of new roofing to retained outbuildings.